Description
Akinci Hydroelectric Power Plant (HPP) is a run-off river based HPP with a total capacity of 99 MWe, utilizing the water of the Kelkit River in the Black Sea region, of Reşadiye-Tokat Province, Turkey. The hydroelectric power plant is designed to convert the potential energy of the Kelkit Stream into electricity by means of 3 turbines of 33 MWe capacity each. The electricity generated is sold to the Turkish National Electricity Grid.
The project activity has been operational since commissioning (24/10/2018) and during the first monitoring period i.e. from 24/10/2018 to 30/09/2020, it has generated 734,652.19 MWh net electricity, thereby resulting in emission reduction of 377,610 tCO2e. The monitoring period subject to this monitoring report is inclusive of first and last day of period.